Stages of a bathroom remodel in San Pedro
In the beginning there is a detailed estimate which includes the time line and all costs.
After the review of the estimate and all points are agreed on, its time to pick out and purchase all the tiles, sinks, faucets etc. Having them on site will help a lot in keeping to the time line.
Remodel can begin
First Stage: Property protection

This is a master bath and the owners dont want to move from their bedroom. The problem is solved by zip doors and good protection from all the work and dust.
Second Stage: Demolition

There was a lot of tile to be taken out plus a cast iron tub.
After the bathroom demolition is done, the debris is picked up. 1700 pounds of tile!