310-831-6310

Silva Construction at the
Redondo Beach 10K

The crew of Silva Construction volunteers staffed the water station at the 10K Super Bowl Sunday Run in Redondo Beach, CA.   All of us were up well before the race started  to set up the tables, pouring cups of water to quench the thirst of all the runners. It was fun...

Analytics Plugin created by Web Hosting